Wednesday, 17 July 2013

Final Project :3D animation Work in progress

Moving in more furniture for the 3D walk through animation



Check mirror reflection

Too bright

Put in more lightings and adjust the intensity

Check lighting

Play with the light distribution and the shape for better lighting

Test render to check lighting


Reduced light multiplier for shorter render time

Add omni light to lighten up the surroundings

Set the door pivot

Rotate the door time to time during the specific frame

Move the camera target to a desired point

26 hours needed to render the 300 frames in that particular scene

Done 17 hours of 100 frames of rendering but the interior is exposed to the sky, RENDER AGAIN.

8 hrs to render 150 frame of the exterior scene

Re-render due to the mistake in the brightness of the 200 frames in that scene, this could be seen in the video below.

9 hours of render but things went wrong :(


FINALLY , IT'S VIDEO COMPILING TIME 
(So sorry I forgot to print screen earlier progress)

Add slides as the opening of the video

Credits at the end of the video

Insert appropriate music to the video




No comments:

Post a Comment